? ? ?? ?
? Better?manufacture in field with the wire rod digging machine in China
?
welcome?to?my?store,we?are?the?most?professional?manufacture?of?digging?machines.Here?are?some?introduction?of?pictures:?look?down:
?
?Wire?rod?digging?machine?bored?piling?equipment?have?7?founction?for?choose?:digging?,ditching,?etc.suitable?for?building?fast?into?the?hole?in?foundation?engineering?construction?machinery.Its?construction?of?high?efficiency,?is?the?electric?power,?communication,?municipal,?railway,?highway,?construction,?petroleum,?trees,It?uses?the?drive?2?0r?drive?4?tractor?power?as?its?powersource?and?has?a?good?filed?work?characteristic.?The?frontloadingstructure,?fully?hydraulic?power,?high?strength?alloy?bit,?torsionproof?andtensile?strength?spiral?drill?pipe,?largetonnage?telescopic?crane,?all?thesedevices?make?sure?the?operation?is?safety?and?flexible.One?person?canoperate?the?machine?easily?and?conveniently,?which?greatly?improve?theworking?efficiency.?Drill,?drill?stem?and?supported?arm?are?assembled?in?aspecial?way,?which?makes?it?more?convenient?to?disassemble.?It?makes?thelongdistance?transportation?and?shortdistance?movement?easier.
?
?
?
?
Model?No. | WD-CE-01 | DESCRIPTION | Hole?digger |
1/power:?1004type?four?wheel?tractor(Four-wheel?drive) | |||
2/The?length?of?drill:?1-6meters(customer?booked) | |||
3/Bit?diameter:?300-1200mm(customer?booked) | |||
4/Spiral?drill?hydraulic?drive?form:?hydraulic?hoist | |||
5/Standard?bar?pit?time:?40?seconds?(500mm?in?diameter?x?depth?3M) | |||
6/Function:digging?,lifting?and?Bulldozing. | |||
7/Net/Gross?Weight:?6.68t/6.8t? | |||
8/Package?Dimension:full?20?feet?container | |||
9/color:green?and?yellow | |||
10/Working?principle:?screw?be?pushed?by?power?from?hydraulic. |
Matters?needing?attention?before?use?:(must?refuel?before?start?the?machine)
?1.?Refuel?the?tractor?engine?(Gear?oil,?diesel?oil,?hydraulic?oil,?cooling?liquid)
?2.?Refuel?the?tractor?digging?system?(hydraulic?oil)?gear?oil?(High speed?butter)
?3.Refuel?each?joint?(butter)?once?a?working?day
?4.Empty?running?are?not?allowed?to?start?walking?hydraulic?system.
?Switch?off?the?hVdraulic?system?before?the?vehicle?stoYpped.?Open?the?hydraulic?system?30?minutes?early?before?work?in?winter,?20?minutes;early?in?summer.?Steadily?accelerate?from?slow?to?fast.
?5.Single?operation?lever?is?the?reverse?rotation?lever.
?6.Nut?27?is?a?pressure?regulating?valve.
?7.operating?lever?is?the?big?arm?lifting?rod.
?8.operating?lever?is?to?control?the?drill?bit?to?move?front?or?back.
?9.operating?lever?is?the?vertical?bar?controller.
?10.Max.?lifting?weight:?3-4t.
?11.Heavy?lifting?from?the?host?cannot?be?more?than?7meters.
?
?
?
Wire?rod?digging?machine?bored?piling?equipment?could?be?product?well?in?7?days,?custoer?can?also?come?to?factory?see?workers?working,?testing?machine,?far?way?customer,?we?can?take?photos?of?machine?during?product
?