?Large quantity Hammer Pile Driver For Driving Pile Piling auger?
?
WADE Machinery.?V?series?high?frequency?excavator?hydraulic?piling?machine?is?using
vibrating?pile?sinking?to?drive?or?extract?piles.?It?is?especially?suitable?for?municipal,?bridges,cofferdam,?building?foundation?etc.?such?short?pile?projects.?
?
Advantages
?
?
- Easy?operation
- Flexible?control
- Silence?operation
- Easy?maintenance
- Precision?design
- Reliable?performance
- Quick?speed
- Save?time
Features Description
?
1.Four?wheel?drive,?easy?and?smart?to?operate
2.Large?torque?motor,?with?strong?power
3.Joystick?control,?Easily?operation
4.Optional?different?screw?driving?unit,?which?could?meet?a?variety?of?customer?needs?in?different?screws.
5.Wide?view?cabin,?which?facilitate?the?operator?to?observe?the?working?environment
6.Equipped?with?a?inclinometer,?to?facilitate?the?operator’s?adjustment;
7.Equipped?with?high-low?speed?gear?shift,?improve?work?efficiency;
8.Unique?and?new?design?based?on?the?wheel?loader,?easy?to?operate?and?maintenance?is?simple?and?convenient
9.Optional?electrical?gear?shift?with?combined?joystick,?and?electronic?inclinometer,?which?can?meet?customer’s?different?needs.
10.Widely?applied?in?pile?solar?system,?street?lights,?all?kinds?of?awning?etc.
?
?
?
?
Operating?principle?
?
??
?1.?V?series?high?frequency?hydraulic?vibratory?pile?driver?internally?installed?two?eccentric?shaft.?It?adopts?hydraulic?motor?to?drive?and?produce?high-speed?revolution?and?vertical?vibration?force.?Through?the?damping?rubber?block?to?maintain?a?certain?amplitude?to?cope?with?various?types?of?soil?and?pile?driving.
?
?2.Exciting?force?is?proportional?to?the?eccentric?shaft?size?and?the?vibration?times?square.?BEIYI?eccentric?shafts?are?all?made?after?a?detailed?calculation?and?test?which?can?combine?strong?vibration?force?and?material?properties,?not?only?can?meet?the?needs?of?the?work?but?also?guarantee?the?mechanical?reliability.
?
The?construction?principle?
?
??
?Vibrating?pile?hammer?is?using?its?high?frequency?vibration?to?vibrate?pile?body?with?high?acceleration?to?pass?the?vertical?vibration?of?mechanical?produce?to?pile?which?leading?to?changes?in?the?soil?structure?around?the?pile,?strength?decrease.?Soil?around?the?piles?become?liquefaction?to?reduce?frictional?resistance?between?side?of?the?pile?and?the?soil.?
?
?Then?using?the?excavator?down?force,?vibrating?pile?hammer?and?pile?body?weight?to?sink?pile?into?the?soil.?When?extracting?piles,?in?the?condition?of?vibration?to?pull?out?the?pile?by?using?excavator?lift?force.?
?
?Excitation?force?needed?by?pile?driving?machinery?are?comprehensive?determined?by?site?soil,?soil?condition,?moisture?content?and?type?of?pile,?construction.
?
?The?efficient?of?vibration?pile?method?is?higher?than?other?methods.?It?is?mainly?applied?to?steel?sheet?pile,?steel?pipe?pile?and?long?slender?concrete?precast?pile?within?8?meters.?
?
?This?pile?driving?method?is?the?most?suitable?for?working?in?sand?and?poorer?effect?in?the?clay?which?must?select?higher?power?model?machines.
?
The?performance?specification?table?
Power?rating | 50?KW |
Rated?speed? | 2400?r/min ? |
Start?the?voltage | 24?V ? |
Dimension | 4370?x?2010?x?4290?mm ? |
Crawler?plate?width | 260?mm ? |
Highest?pole | 4370mm ? |
Scope?of?operation?parameters?of?borehole?diameter | 400-800mm ? |
Maximum?drilling?depth? | 15m ? |
Drill?pipe?rotation?speed | 71?r/min ? |
Hydraulic?system?of?main?pump?model | CBG1?-?F032/032 ? |
The?main?pump?speed | 2000-2400L/min |
The?main?pump?pressure? | 20?Mpa |
The?main?valve?flow | ?100?L/min ? |
Hydraulic?tank?volume | 200L ? |
The?performance?parameters?of?gradability ? | degrees?30 |
Maximum?speed | 5?KM/h ? |
??Operation example
?
?
? We will choose the most suitable rapid economic logistics for you or you can choose your trust logistics.
?
Q:What's?the?function?of?it?
It?is?a?machine?for?pile?hole?drilling,?it?drill?the?ground?screws?into?the?earth,?after?that?you?can?fix?many?upper?ground?constructions?on?the?drilled?screws.
?
What's?the?usage?of?it?
A:?It?was?widely?used?in?solar?project,?road?lights?or?signals?fixing,?sunshade?or?pavilion?constructions,?etc.
?
What's?the?warranty?and?service?
Warranty?is?one?year?or?1000?working?hours?whichever?comes?first.?During?warranty?period,?we'll?post?the?parts?with?express,?normally?takes?4~5?days?to?arrive.?And?also?we?will?offer?relative?training?or?services?to?help?the?user?better?use?it.
?
??Zhengzhou WADE?Excavator Parts Factory, we are excavator parts factory, have 15 years experience, and a capable R&D team. Our product range includes hydraulic pile breaker, pile driver, hydraulic hammer, ripper, earth auger, hydraulic pulverizer, etc. With ISO9001, SGS and CE certificates.
?